TR | EN

Dr. Öğr. Üyesi Gökhan Gelişen

Bahçeşehir Üniversitesi, Mühendislik ve Doğa Bilimleri Fakültesi

İnşaat Mühendisliği Bölümü

MAKALELER

  1. “Extension of Time Related Monetary Claims”, Bahcesehir University Law Review, Vol. 11, No. 147-148, Pg. 37-51 (December 2016)
  2. “Importance of Reducing Rail Stresses”, Association of Railroad Engineering, 77-81 (July 2016)
  3. “Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis”, Journal of Construction Engineering and Management (ASCE), 140(4), B4013007-1/B4013007-10, (April 2014)
  4. “Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo”, Journal of Construction Engineering and Management (ASCE), 140(4), C4013007-1/C4013007-10, (April 2014)
  5. “PBQuant: Quantity Take-off for CADD-COST Software Integration”, Emerging Professionals Paper Competition, Parsons Brinkerhoff Quade & Douglas Inc., New York, NY (June 2005)

KONFERANS BİLDİRİLERİ

  1. “Avoiding and Managing Disputes over Defaults: An Industry Perspective”, Istanbul International Construction Law Conference, Bilgi University, (April 2017)
  2. “Evaluation of Steel Bridge Truss Systems by Conversion to Equivalent Box Girders”, Proceedings of Istanbul Bridge Conference, iBridge2016, ISBN 978-605-65900-5-4 (August 2016)
  3. “Extension of Time Related Monetary Claims”, INTES-ISTAC Construction Conference, Tekfen Tower, Istanbul (October 2016)
  4. “Contributions of Turkish American Architects and Engineers to American Skyline”, 3rd Annual MIM & Columbia University Earth and Environmental Engineering Department Joint Conference, Columbia University School of Engineering & Applied Science, New York, NY (October 2013)
  5. “A Turkish Engineer Builds High”, The 32nd Annual Turkish American National Convention, The Washington Plaza, Washington, DC (April 2012)
  6. “Automated Productivity Based Schedule Animation (APBSA): A Simulation Based Approach to Time-Cost Trade-off Analysis”, TASSA Annual Conference, University of Maryland, College Park, MD (March 2012)
  7. “APBSA Case Study: Systems Engineering Facility III, Hanscom AFB, MA”, PMICOS Annual Scheduling Conference, The Fairmont Palliser, Calgary, Alberta, Canada (May 2010)
  8. “Automated Productivity Based Schedule Animation (APBSA)”, PMICOS Annual Scheduling Conference, Renaissance Boston Waterfront, Boston, MA (May 2009)
  9. “Challenges, Opportunities and Crucial Role Engineers Play in Society”, American Engineering Alliance (AEA) Annual Event, Cooper Union, New York, NY (March 2009)
  10. “Automated Productivity Based Schedule Animation (APBSA)”, TASSA Annual Conference, Harvard University, Boston, MA (April 2008)
  11. “Improving Labor Productivity Rates for Nuclear Power Plant Construction”, TASSA Annual Conference, Yale University, New Haven, CT (March 2007)
  12. “Building Information Modeling Application for Environmental Impact Statement (BIMAFEIS)”, TASSA Annual Conference, Yale University, New Haven, CT (March 2007)
  13. Safety and Environmental Aspects of Nuclear Power Plants”, The Light Millenium, Turkish House, New York, NY (May 2006)
  14. “Nuclear Energy Facts and Figures”, TASSA Annual Conference, Drexel University, Philadelphia, PA (March 2006)

KİTAPLAR